{"id":7776,"date":"2023-09-20T13:41:13","date_gmt":"2023-09-20T13:41:13","guid":{"rendered":"https:\/\/roydadnaft.ir\/English\/?p=7776"},"modified":"2023-09-20T13:41:13","modified_gmt":"2023-09-20T13:41:13","slug":"canadas-enbridge-could-add-200000-bpd-to-mainline-oil-pipeline-capacity","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/7776\/","title":{"rendered":"Canada&#8217;s Enbridge could add 200,000 bpd to Mainline oil pipeline capacity"},"content":{"rendered":"<div class=\"entry-content\" itemprop=\"description\"><p><span class=\"pre-content-text\"><a style=\"color: #0038a8;\" href=\"https:\/\/roydadnaft.ir\/English\/\">RoydadNaft &#8211; <\/a><\/span>\u00a0Enbridge Inc could add 200,000 barrels per day (bpd) of capacity to its 3 million bpd Mainline system, which ships the bulk of Canada&#8217;s crude exports to the United States, a company executive said on Tuesday.<\/p>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__small__1kGq2 body__full_width__ekUdw body__small_body__2vQyf article-body__paragraph__2-BtD\" data-testid=\"paragraph-1\">However, Enbridge would only look at proceeding with the expansion once the Canadian government-owned Trans Mountain expansion (TMX) project starts operating, said Marc Weil, a senior vice president in the company&#8217;s Liquids Pipelines business.<\/p>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__small__1kGq2 body__full_width__ekUdw body__small_body__2vQyf article-body__paragraph__2-BtD\" data-testid=\"paragraph-2\">TMX, which will compete with the Mainline, will add another 590,000 bpd of pipeline capacity to Canada&#8217;s Pacific Coast once complete. But the long overdue project, due to start operating in the first quarter of 2024, is\u00a0facing further delays\u00a0because of a last-minute route deviation request in British Columbia.<\/p>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__small__1kGq2 body__full_width__ekUdw body__small_body__2vQyf article-body__paragraph__2-BtD\" data-testid=\"paragraph-3\">&#8220;Obviously industry would like to see TMX come online and see how that shakes out,&#8221; Weil said in an interview.<\/p>\n<div class=\"article-body__element__2p5pI\">\n<div class=\"spacing-container__container__2g5QT spacing-container__t-spacing-single-three-quarters__2_moJ spacing-container__b-spacing-single-three-quarters__1fuBK spacing-container__max-width__zScFd\" data-testid=\"ResponsiveAdSlot\">\n<div class=\"ad-slot__container__FEnoz ad-slot__fixed-height__6m70D\">\n<div class=\"ad-slot__inner__2u45U\">\n<div>&#8220;Once that happens, we do have some additional egress options for the basin and we think that at the right point in time, (producers) will be looking for some additional insurance and we&#8217;d be engaging in talks with them at that point.&#8221;<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__small__1kGq2 body__full_width__ekUdw body__small_body__2vQyf article-body__paragraph__2-BtD\" data-testid=\"paragraph-5\">Once TMX starts operating, western Canada will have more export capacity than it needs, but oil companies are already increasing production in anticipation of the extra pipeline space.<\/p>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__small__1kGq2 body__full_width__ekUdw body__small_body__2vQyf article-body__paragraph__2-BtD\" data-testid=\"paragraph-6\">Weil said the longer TMX is delayed the higher the chance western Canadian export pipelines could hit capacity.<\/p>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__small__1kGq2 body__full_width__ekUdw body__small_body__2vQyf article-body__paragraph__2-BtD\" data-testid=\"paragraph-7\">Enbridge&#8217;s Mainline is already &#8220;essentially full right now&#8221; Weil added.<\/p>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__small__1kGq2 body__full_width__ekUdw body__small_body__2vQyf article-body__paragraph__2-BtD\" data-testid=\"paragraph-8\">The amount of crude shippers can transport on the system will be rationed in October because demand to move oil exceeds available capacity, a process known as apportionment, the company said. Light crude volumes will be apportioned by 7% and heavy volumes by 10%.<\/p>\n<div class=\"post-date no-social-btn post-updated\">Updated on<time class=\"updated dt-updated\" itemprop=\"dateModified\" datetime=\"2023-09-20T13:41:13+00:00\"> 20 September 2023<\/time><\/div><\/div>","protected":false},"excerpt":{"rendered":"Enbridge Inc could add 200,000 barrels per day (bpd) of capacity to its 3 million bpd Mainline system, which ships the bulk of Canada&#8217;s crude exports to the United States, a company executive said on Tuesday.","protected":false},"author":1,"featured_media":7777,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,36,19,16,35],"tags":[],"services":[],"class_list":["post-7776","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-international","category-lastnews","category-news","category-oil","category-topnews"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/7776","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=7776"}],"version-history":[{"count":0,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/7776\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/7777"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=7776"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=7776"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=7776"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=7776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}