{"id":5066,"date":"2023-04-28T14:03:09","date_gmt":"2023-04-28T14:03:09","guid":{"rendered":"http:\/\/roydadnaft.ir\/English\/?p=5066"},"modified":"2023-04-28T14:04:29","modified_gmt":"2023-04-28T14:04:29","slug":"steam-unit-of-west-karoun-combined-cycle-power-plant-launched-by-president","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/5066\/","title":{"rendered":"Steam unit of West Karoun Combined-Cycle Power Plant launched by president"},"content":{"rendered":"<div class=\"entry-content\" itemprop=\"description\">\n<p>The steam unit of West Karoun Combined-Cycle Power Plant was on Friday inaugurated by Iranian President Seyyed Ebrahim Raeisi visiting the southwestern province of Khuzestan.<\/p>\n\n\n\n<p>The steam unit launch coincided with a 200-megawatt increase in the plant\u2019s power generation capacity.<\/p>\n\n\n\n<p>West Karoun Combined-Cycle Power Plant has two gas-fired units with a 166 MW nominal capacity and one steam unit having a 160 MW nominal capacity.<\/p>\n\n\n\n<p>The plant has high-voltage substations and power transmission lines installed by Iranian experts, supplying West Karoun oil fields with power.<\/p>\n\n\n\n<p>Up to now, two 400-kilovolt (kV) substations, two 230 kV substations, and 180-kilometer-long transmission lines have been set up, and 120 kilometers more are under construction.<\/p>\n\n\n\n<p>In addition, West Karoun Combined-Cycle Power Plant has been transmitting the surplus electricity production (SEP) to the national grid over the past three years.<\/p>\n<div class=\"post-date no-social-btn post-updated\">Updated on<time class=\"updated dt-updated\" itemprop=\"dateModified\" datetime=\"2023-04-28T14:04:29+00:00\"> 28 April 2023<\/time><\/div><\/div>","protected":false},"excerpt":{"rendered":"The steam unit of West Karoun Combined-Cycle Power Plant was on Friday inaugurated by Iranian President Seyyed Ebrahim Raeisi visiting the southwestern province of Khuzestan. The steam unit launch coincided with a 200-megawatt increase in the plant\u2019s power generation capacity. West Karoun Combined-Cycle Power Plant has two gas-fired units with a 166 MW nominal capacity [&hellip;]","protected":false},"author":1,"featured_media":5067,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[17,20,18,22,36,19],"tags":[],"services":[],"class_list":["post-5066","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy","category-gas","category-headline","category-iran","category-lastnews","category-news"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/5066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=5066"}],"version-history":[{"count":0,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/5066\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/5067"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=5066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=5066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=5066"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=5066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}