{"id":18994,"date":"2026-10-05T04:15:16","date_gmt":"2026-10-05T04:15:16","guid":{"rendered":"https:\/\/roydadnaft.ir\/English\/?p=18994"},"modified":"2026-10-05T04:15:16","modified_gmt":"2026-10-05T04:15:16","slug":"gachsaran-keeps-oil-and-gas-flowing-in-iran-under-wartime-conditions","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/18994\/","title":{"rendered":"Gachsaran Keeps Oil and Gas Flowing in Iran Under Wartime Conditions"},"content":{"rendered":"<p><span class=\"pre-content-text\"><a style=\"color: #0038a8;\" href=\"https:\/\/roydadnaft.ir\/English\/\">RoydadNaft &#8211; <\/a><\/span>\u00a0The chief executive of Gachsaran Oil and Gas Production Company said oil and gas output continued without a break during the third imposed war and that, despite hard conditions, production did not fall. Operational projects added 15,000 barrels a day to the Mansourabad field.<\/p>\n<p>According to Roydad Naft, Ali Akbar Hafezinia told Shana that production at the company went on without interruption. In Mansourabad, 15,000 barrels a day were added to capacity.<\/p>\n<p>Despite the difficulties and concerns of the war, there was no stoppage, and production and transfer staff met the output program through round-the-clock work, he said.<\/p>\n<p>Measures from the third imposed war on passive defense, resilience, and holding production have been documented, and more detail will be released when conditions allow.<\/p>\n<p>Hafezinia said 30 kilometers of 6-inch and 8-inch pipeline were built in less than four months. The project was meant to create a gas ring, stabilize Gachsaran output, and open the way for higher production at Mansourabad.<\/p>\n<p>A six-month schedule had been set, but staff finished the work in less than four months, and the line is due to enter production soon on plan, he said.<\/p>\n<p>On Oil Ministry policy to gather associated gas and cut flaring, four contracts tied to Gachsaran Oil and Gas Production Company have been settled and contractors named.<\/p>\n<p>The projects are in Bibi Hakimeh, Golkhari, Rag-e Sefid, and Gachsaran, and work has started.<\/p>\n<p>In the Gachsaran sector, gathering of about 20 million cubic feet of gas is due to start in December 2026. Persian Gulf Petrochemical Industries Company is carrying out that part through its subsidiaries.<\/p>\n<p>Gathering associated gas matters for winter supply, Hafezinia said. The National Iranian Oil Company and the National Iranian South Oil Company want each company to meet its share of gathering projects so autumn and winter do not bring a gas-supply problem.<\/p>\n<p>A joint working group has been formed for the first time in recent years to manage oil transfer from Goreh to storage, with NISOC, the export-supervision department, the production side, and Gachsaran Oil and Gas Production Company. The aim is integrated management of oil moved to Petropars Asia tanks and handed to the relevant company.<\/p>\n<p>The company has strategic tanks of about 4 million barrels, and preventive and corrective work is under way to fix some defects in them, he said.<\/p>\n","protected":false},"excerpt":{"rendered":"The chief executive of Gachsaran Oil and Gas Production Company said oil and gas output continued without a break during the third imposed war and that, despite hard conditions, production did not fall. Operational projects added 15,000 barrels a day to the Mansourabad field.","protected":false},"author":1,"featured_media":18995,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47,22,36,19,16,35],"tags":[],"services":[],"class_list":["post-18994","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-iran","category-lastnews","category-news","category-oil","category-topnews"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/18994","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=18994"}],"version-history":[{"count":1,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/18994\/revisions"}],"predecessor-version":[{"id":18996,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/18994\/revisions\/18996"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/18995"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=18994"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=18994"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=18994"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=18994"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}