{"id":17586,"date":"2026-07-13T13:43:53","date_gmt":"2026-07-13T13:43:53","guid":{"rendered":"https:\/\/roydadnaft.ir\/English\/?p=17586"},"modified":"2026-07-13T13:43:53","modified_gmt":"2026-07-13T13:43:53","slug":"india-tells-clean-energy-firms-to-lose-grid-connection-or-generate-power","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/17586\/","title":{"rendered":"India tells clean energy firms to lose grid connection or generate power"},"content":{"rendered":"<div class=\"entry-content\"><p><span class=\"pre-content-text\"><a style=\"color: #0038a8;\" href=\"https:\/\/roydadnaft.ir\/English\/\">RoydadNaft &#8211; <\/a><\/span>\u00a0India has asked renewable energy companies to either surrender transmission rights or provide higher bank guarantees if they \u200cfail to generate power, as the country seeks to free up grid capacity for projects that are actually producing electricity, according to a regulatory order.<\/p>\n<p data-reader-unique-id=\"38\">Here are some details:<\/p>\n<div data-testid=\"ArticleList\" data-reader-unique-id=\"41\">\n<ul role=\"list\" data-testid=\"unordered-0\" data-reader-unique-id=\"42\">\n<li data-reader-unique-id=\"43\">\n<p data-reader-unique-id=\"44\">The companies can \u2060also transfer transmission rights for their group utility that are generating but does not have connectivity to grid, an order from the Central Electricity Regulatory Commission dated July 11 said.<\/p>\n<\/li>\n<li data-reader-unique-id=\"45\">\n<p data-reader-unique-id=\"46\">A substantial amount of renewable energy capacity has been awarded between 2019-2025 to power producers, but most of it \u200cdoes \u2060not yet have customers, the CERC said.<\/p>\n<\/li>\n<li data-reader-unique-id=\"47\">\n<p data-reader-unique-id=\"48\">As a result, transmission access is being occupied by projects that may not move ahead, and CERC believes about 15.7 \u2060GW of this connectivity could be released for other developers.<\/p>\n<\/li>\n<li data-reader-unique-id=\"49\">\n<p data-reader-unique-id=\"50\">Power producers can also retain transmission connectivity, provide additional \u2060bank guarantees, but develop the power project independently, the CERC said.<\/p>\n<\/li>\n<li data-reader-unique-id=\"51\">\n<p data-reader-unique-id=\"52\">Connectivity surrendered will first be \u2060offered to existing applicants in the same substation cluster and any remaining capacity will be auctioned.<\/p>\n<\/li>\n<\/ul>\n<\/div>\n<div class=\"post-date no-social-btn post-updated\">Updated on<time class=\"updated dt-updated\" datetime=\"2026-07-13T13:43:53+00:00\"> 13 July 2026<\/time><\/div><\/div>","protected":false},"excerpt":{"rendered":"India has asked renewable energy companies to either surrender transmission rights or provide higher bank guarantees if they \u200cfail to generate power, as the country seeks to free up grid capacity for projects that are actually producing electricity, according to a regulatory order.","protected":false},"author":1,"featured_media":17587,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[47,46,36,45,35],"tags":[],"services":[],"class_list":["post-17586","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-international","category-lastnews","category-renewable-energy","category-topnews"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/17586","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=17586"}],"version-history":[{"count":1,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/17586\/revisions"}],"predecessor-version":[{"id":17588,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/17586\/revisions\/17588"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/17587"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=17586"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=17586"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=17586"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=17586"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}