{"id":16153,"date":"2025-11-24T08:53:06","date_gmt":"2025-11-24T08:53:06","guid":{"rendered":"https:\/\/roydadnaft.ir\/English\/?p=16153"},"modified":"2025-11-24T08:53:06","modified_gmt":"2025-11-24T08:53:06","slug":"isfahan-oil-refinery-flare-gas-recovery-project-progress-at-85","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/16153\/","title":{"rendered":"Isfahan Oil Refinery flare gas recovery project progress at 85%"},"content":{"rendered":"<div class=\"entry-content\" itemprop=\"description\"><p><span class=\"pre-content-text\"><a style=\"color: #0038a8;\" href=\"https:\/\/roydadnaft.ir\/English\/\">RoydadNaft &#8211; <\/a><\/span>\u00a0The CEO of Isfahan Oil Refinery said the refinery\u2019s flare gas recovery project has reached 85% physical progress and is scheduled to come online by the end of 2025. The project is being implemented with a budget of more than 6.8 million euros and 520 billion rials.<\/p>\n<div class=\"item-body\">\n<div class=\"item-text\">\n<p dir=\"ltr\">According to the company, CEO Gholamreza Baqeri Dizaj said the flare gas recovery (FGR) project is one of the refinery\u2019s most important environmental initiatives. The project aims to fully eliminate flare gas emissions and, once operational, will remove the refinery from the scope of Note 4, Article 4 of the executive bylaw related to Article 27 of the value-added tax law.<\/p>\n<p dir=\"ltr\">He said feasibility studies for constructing a sulfur management unit began in 1402, and the project received approval from the Department of Environment in November 2025. The project, approved with a budget of 200 million euros, is designed to convert all solid sulfur output\u2014currently sold in bulk\u2014along with waste gases and industrial effluents into environmentally friendly products for agricultural use. Baqeri Dizaj said the unit will require no fresh water, with all its water needs supplied through graywater and industrial wastewater.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\"><strong>Refinery Has No Impact on Local Air Quality<\/strong><\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">Baqeri Dizaj said the refinery conducted an air pollutant dispersion modeling project using the AERMOD engineering software in cooperation with specialized firms. The results, which were submitted to the provincial Department of Environment, show the refinery has no impact on air quality in Esfahan or neighboring counties.<\/p>\n<p dir=\"ltr\">He added that, based on provincial resolutions aligned with social responsibility commitments, the refinery has purchased two online ambient air monitoring stations at a cost of more than 600 billion rials. Coordination is underway with the provincial environmental authority to install the equipment at designated sites \u2014 the governor\u2019s office and the entrance of the Esfahan-Tehran highway \u2014 within the next 10 days. The stations can measure a wide range of air pollutants, including SOx, CO, PM10, PM2.5, O\u2083, NO, NO\u2082 and BTEX compounds, and calculate real-time Air Quality Index (AQI) values.<\/p>\n<p dir=\"ltr\">Baqeri Dizaj said the refinery has long monitored emissions from furnace stacks and industrial effluents in accordance with clauses 3 and 4 of Article 11 of the Clean Air Act. Continuous emission monitoring and self-reporting tests conducted by laboratories accredited by the Department of Environment are available around the clock through the agency\u2019s online platform.<\/p>\n<\/div>\n<\/div>\n<div class=\"post-date no-social-btn post-updated\">Updated on<time class=\"updated dt-updated\" itemprop=\"dateModified\" datetime=\"2025-11-24T08:53:06+00:00\"> 24 November 2025<\/time><\/div><\/div>","protected":false},"excerpt":{"rendered":"The CEO of Isfahan Oil Refinery said the refinery\u2019s flare gas recovery project has reached 85% physical progress and is scheduled to come online by the end of 2025. The project is being implemented with a budget of more than 6.8 million euros and 520 billion rials.\r\n","protected":false},"author":1,"featured_media":16154,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[47,20,23,22,36,19,35],"tags":[],"services":[],"class_list":["post-16153","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-gas","category-hse","category-iran","category-lastnews","category-news","category-topnews"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/16153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=16153"}],"version-history":[{"count":0,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/16153\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/16154"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=16153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=16153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=16153"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=16153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}