{"id":15411,"date":"2025-09-10T12:51:58","date_gmt":"2025-09-10T12:51:58","guid":{"rendered":"https:\/\/roydadnaft.ir\/English\/?p=15411"},"modified":"2025-09-10T12:51:58","modified_gmt":"2025-09-10T12:51:58","slug":"nowruz-oil-field-production-increases-with-offshore-cable-operation","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/15411\/","title":{"rendered":"Nowruz Oil Field production increases with offshore cable operation"},"content":{"rendered":"<div class=\"entry-content\" itemprop=\"description\"><p><span class=\"pre-content-text\"><a style=\"color: #0038a8;\" href=\"https:\/\/roydadnaft.ir\/English\/\">RoydadNaft &#8211; <\/a><\/span>\u00a0Oil production from the Nowruz field has increased by 1,500 barrels per day following the completion of a complex offshore power cable operation, according to an Iranian offshore oil company official.<\/p>\n<div class=\"item-body\">\n<div class=\"item-text\">\n<p dir=\"ltr\">Amir Baghlani, head of planning and coordination for port, marine and transportation operations at the Iranian Offshore Oil Co., said the 2-kilometer cable was laid between the field and wellhead platforms to supply them with electricity.<\/p>\n<p dir=\"ltr\">Baghlani emphasized the sensitivity of the operation, which typically requires a vessel with a dynamic positioning system that uses satellite signals to maintain its exact course. However, he stated that sanctions prevented a direct satellite link.<\/p>\n<p dir=\"ltr\">To solve this, domestic knowledge-based companies designed a portable signal receiver to get DGPS signals from the satellite. This device was connected to the vessel&#8217;s DP console, allowing the cable to be laid precisely along the planned route without deviation.<\/p>\n<p dir=\"ltr\">The operation was essential to power subsea pumps for several wells and boost production. Baghlani noted that such operations are highly challenging, requiring specialized, DP-equipped cable-laying vessels, which are scarce and expensive in Iran.<\/p>\n<p dir=\"ltr\">Faced with the unavailability of such a ship, modifications were made to a standard vessel, including installing a cable pulley and the portable signaling equipment. The operation began after receiving technical approvals.<\/p>\n<p dir=\"ltr\">The DP system helps a vessel move in a straight line with minimal error by communicating with satellites. Using a vessel without it would disrupt the project, Baghlani said. By using the domestic company&#8217;s portable technology, the operation was completed successfully with minimal error.<\/p>\n<p dir=\"ltr\">Power and instrument cables between platforms are often damaged by ship anchors or fishing nets, leading to power outages and lost production. This makes such cable-laying operations critical for maintaining platform power and continuous field output.<\/p>\n<\/div>\n<\/div>\n<div class=\"post-date no-social-btn post-updated\">Updated on<time class=\"updated dt-updated\" itemprop=\"dateModified\" datetime=\"2025-09-10T12:51:58+00:00\"> 10 September 2025<\/time><\/div><\/div>","protected":false},"excerpt":{"rendered":"Oil production from the Nowruz field has increased by 1,500 barrels per day following the completion of a complex offshore power cable operation, according to an Iranian offshore oil company official.","protected":false},"author":1,"featured_media":15412,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[47,22,36,19,16,35],"tags":[],"services":[],"class_list":["post-15411","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-iran","category-lastnews","category-news","category-oil","category-topnews"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/15411","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=15411"}],"version-history":[{"count":0,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/15411\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/15412"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=15411"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=15411"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=15411"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=15411"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}