{"id":15145,"date":"2025-08-17T03:54:59","date_gmt":"2025-08-17T03:54:59","guid":{"rendered":"https:\/\/roydadnaft.ir\/English\/?p=15145"},"modified":"2025-08-17T03:54:59","modified_gmt":"2025-08-17T03:54:59","slug":"first-development-well-drilled-at-yadvaran-oil-field","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/15145\/","title":{"rendered":"First development well drilled at Yadvaran oil field"},"content":{"rendered":"<div class=\"entry-content\" itemprop=\"description\"><p><span class=\"pre-content-text\"><a style=\"color: #0038a8;\" href=\"https:\/\/roydadnaft.ir\/English\/\">RoydadNaft &#8211; <\/a><\/span>\u00a0The drilling operations for the first development well in a six-well project at the Yadvaran oil field have been completed using the Fat\u2019h 92 drilling rig, announced the deputy CEO of National Iranian Drilling Company (NIDC) for drilling projects.<\/p>\n<div class=\"item-body\">\n<div class=\"item-text\">\n<p dir=\"ltr\">According to the National Iranian Oil Company (NIOC), Abdolkarim Alimohammadi stated that the first well drilled in the Yadvaran field has been handed over to the Petroleum Engineering and Development Company (PEDEC), the employer overseeing the development of West Karun fields in Khuzestan Province, for production and operation.<\/p>\n<p dir=\"ltr\">Alimohammadi noted that two drilling rigs, Fat\u2019h 92 and Fat\u2019h 28, from NDC\u2019s fleet are stationed at the site. He added that drilling and completion of the second well are in the final stages and are expected to be finished within the next two weeks.<\/p>\n<p dir=\"ltr\">The deputy CEO emphasized that Yadvaran is a shared oil field. The project, executed under an engineering, procurement, and drilling (EPD) contract, began in May last year, with Well No. 43 being the first to be completed and delivered to the employer.<\/p>\n<p dir=\"ltr\">Alimohammadi added that the Fat\u2019h 28 rig is currently drilling and completing Well No. 42 at the site. Plans are also underway to mobilize a third rig to accelerate the project\u2019s progress.<\/p>\n<\/div>\n<\/div>\n<div class=\"post-date no-social-btn post-updated\">Updated on<time class=\"updated dt-updated\" itemprop=\"dateModified\" datetime=\"2025-08-17T03:54:59+00:00\"> 17 August 2025<\/time><\/div><\/div>","protected":false},"excerpt":{"rendered":"The drilling operations for the first development well in a six-well project at the Yadvaran oil field have been completed using the Fat\u2019h 92 drilling rig, announced the deputy CEO of National Iranian Drilling Company (NIDC) for drilling projects.","protected":false},"author":1,"featured_media":15146,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[47,18,22,36,19],"tags":[],"services":[],"class_list":["post-15145","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-headline","category-iran","category-lastnews","category-news"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/15145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=15145"}],"version-history":[{"count":0,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/15145\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/15146"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=15145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=15145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=15145"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=15145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}