{"id":14715,"date":"2025-07-08T03:59:36","date_gmt":"2025-07-08T03:59:36","guid":{"rendered":"https:\/\/roydadnaft.ir\/English\/?p=14715"},"modified":"2025-07-08T03:59:36","modified_gmt":"2025-07-08T03:59:36","slug":"nidc-boosts-local-tech-in-oil-drilling-push","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/14715\/","title":{"rendered":"NIDC boosts local tech in oil drilling push"},"content":{"rendered":"<div class=\"entry-content\" itemprop=\"description\"><p><span class=\"pre-content-text\"><a style=\"color: #0038a8;\" href=\"https:\/\/roydadnaft.ir\/English\/\">RoydadNaft &#8211; <\/a><\/span>\u00a0The CEO of the National Iranian Drilling Company (NIDC) said one of the company\u2019s strategic priorities in recent years has been the localization of key equipment and increasing the share of domestically manufactured components in drilling projects. A notable example is the construction of the third domestically built drilling rig, which resulted in savings of $7 million.<\/p>\n<div class=\"item-body\">\n<div class=\"item-text\">\n<p dir=\"ltr\"><em>\u201cDrilling is the starting point in the oil and gas value chain,\u201d Mehran Makvandi said. \u201cWithout drilling, there is no access to hydrocarbon resources.\u201d This complex and technical process enables access to oil and gas reservoirs deep underground and serves as the link between geology and production, playing a fundamental role in the country\u2019s energy security.<\/em><\/p>\n<p dir=\"ltr\"><em>The importance of drilling extends beyond resource extraction; the speed, precision, safety, and cost of drilling directly affect upstream project economics and return on investment.<\/em><\/p>\n<p dir=\"ltr\"><em>As a technology-based industry, drilling integrates modern engineering technologies, advanced equipment, and skilled professionals. Localizing rigs, critical components, and technical services\u2014including cementing, drilling fluids, wireline logging, and well testing\u2014not only reduces dependency on foreign suppliers but also generates jobs, facilitates knowledge transfer, and increases the oil industry\u2019s resilience to sanctions. This is why strengthening drilling infrastructure has been a long-standing national energy policy priority.<\/em><\/p>\n<p dir=\"ltr\"><em>Founded in December 1979, NIDC began operations with just six drilling rigs. Today, it operates dozens of land and offshore rigs and provides over 25 specialized technical services. Despite financial and technical challenges and international sanctions in recent years, the company has revitalized much of its capacity through modernization projects, technological upgrades, knowledge-based collaborations, and equipment localization efforts.<\/em><\/p>\n<p dir=\"ltr\"><em>In an interview with Shana, Makvandi, CEO of NIDC, discussed the company\u2019s past performance, future plans, interagency cooperation, and role in expanding the country\u2019s oil and gas fields.<\/em><\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">\u00a0<strong>Drilling 100 wells in one year<\/strong><\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">Asked what led NIDC to successfully drill, repair, and complete 100 oil and gas wells in the Iranian year 1403 (March 2024\u2013March 2025), Makvandi cited the use of 62 active rigs, the reactivation of two additional rigs, and improved interdepartmental coordination and efficiency.<\/p>\n<p dir=\"ltr\">\u201cThis included 24 development and appraisal wells, and 76 repair and completion operations,\u201d he said. \u201cIt marks a significant leap forward given the economic and sanction-related constraints.\u201d<\/p>\n<p dir=\"ltr\">He credited the reactivation of rigs\u2014such as Rig 48 in Kharg and domestically manufactured Rig 73\u2014as key contributors. Increased operational efficiency, minimized downtime, and reliance on domestic resources were the cornerstones of this achievement.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">\u00a0<strong>Strategic rig procurement plan<\/strong><\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">NIDC has been excluded from Iran\u2019s privatization list under Article 44 of the Constitution, allowing it to reinvest in fleet renewal. The company, backed by the Oil Ministry and the National Iranian Oil Co., is now pursuing the purchase of 15 onshore drilling rigs with power capacities of 1,000 to 3,000 horsepower. The estimated investment is around $800 million.<\/p>\n<p dir=\"ltr\">\u201cThese rigs are specifically designed for exploratory and appraisal purposes and will be equipped with the latest technologies,\u201d Makvandi said.<\/p>\n<p dir=\"ltr\">In addition, the company plans to procure specialized technical service equipment such as high-pressure pumps, formation testing tools, wireline logging equipment, coiled tubing units, and well-testing systems. A joint oversight committee has been established with NIOC\u2019s integrated planning department to ensure alignment with the existing fleet.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\"><strong>\u00a0Localization challenges, progress<\/strong><\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">Makvandi emphasized that equipment localization and boosting domestic manufacturing remain key strategic goals. The company has expanded partnerships with domestic manufacturers, such as Fajr Shiraz Complex, which has a track record of building core rig components.<\/p>\n<p dir=\"ltr\">The latest example, the third domestically built rig, saved \\$7 million through efficient use of local engineering and resource management.<\/p>\n<p dir=\"ltr\">\u201cPrioritization is based on field needs, project type\u2014whether developmental, exploratory, or repair-related\u2014and domestic manufacturing capacity,\u201d he said. Challenges include limited technical infrastructure, the need for technology transfer, and timely access to high-quality components. However, the focus remains on reducing foreign dependency.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\"><strong>\u00a0Highlighting innovation at Iran Oil Show<\/strong><\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">At the 29th Iran International Oil Show, NIDC signed two key contracts with new technology-based firms\u2014one to produce nine one-megawatt generator motors and the other to manufacture four centrifuges for drilling fluid treatment. These technologies, once imported, will now be domestically produced to national standards.<\/p>\n<p dir=\"ltr\">The first units will be operational by year-end. A clear roadmap has been laid out for field deployment of these technologies, including ongoing collaboration with science and technology parks, universities, and knowledge-based firms. Field tests are already underway, focused on cost reduction, drilling precision, and faster well completion.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\"><strong>\u00a0Strategic cooperation with NIOC exploration<\/strong><\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">NIDC also signed a memorandum of understanding with NIOC\u2019s Exploration Directorate, assigning three high-power rigs\u2014one at 3,000 horsepower and two at 2,000 horsepower\u2014for use in exploratory operations. These rigs will feature advanced technology and support efforts to discover new oil and gas fields.<\/p>\n<p dir=\"ltr\">\u201cExploratory drilling is the starting point of every hydrocarbon field\u2019s development,\u201d Makvandi said. \u201cThis collaboration helps accelerate timelines and improve drilling quality, especially in remote or border regions.\u201d<\/p>\n<p dir=\"ltr\">Regular coordination meetings are underway, and plans include rig customization for exploratory missions and deployment of specialized field teams.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">\u00a0<strong>Strengthening engineering, HSE<\/strong><\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">Makvandi said the company is committed to strengthening its engineering capabilities. This includes upgrading design software, continuous training, localized technical guidelines, and the use of real-time drilling monitoring systems. The company\u2019s drilling study unit is now more active in providing project-specific technical consultations.<\/p>\n<p dir=\"ltr\">In terms of health, safety, and environment (HSE), NIDC has promoted a safety-first culture, held specialized training for field personnel, and upgraded safety systems on rigs. To reduce operational delays, the company established a non-productive time (NPT) analysis committee and implemented performance evaluation systems and effective collaboration with field operators.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">\u00a0<strong>Future outlook: Digital transformation, modernization<\/strong><\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">Makvandi believes that international engagement would further benefit the company\u2014not only through easier access to advanced equipment but also by enabling international training programs, certifications, and potentially exporting drilling services.<\/p>\n<p dir=\"ltr\">Recent investments and contracts reflect accelerating development and modernization in Iran\u2019s drilling sector. Over the next five years, NIDC\u2019s strategic focus areas include:<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">&#8211; Fleet modernization, with a focus on new land and offshore rigs.<\/p>\n<p dir=\"ltr\">&#8211; Expansion of offshore drilling, particularly in Persian Gulf fields.<\/p>\n<p dir=\"ltr\">&#8211; Upgrading and integrating technical service equipment for faster, more accurate operations.<\/p>\n<p dir=\"ltr\">&#8211; Digitalization of drilling processes, from design and monitoring to data analysis and management, to improve decision-making, safety, and cost-efficiency.<\/p>\n<p dir=\"ltr\">&#8211; Stronger partnerships with scientific and knowledge-based institutions.<\/p>\n<p dir=\"ltr\">&#8211; Human capital development and enhancing international competitiveness.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">The company has already reduced non-productive time from 21% to 9.6% and aims to cut it below 3% by 2029.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\"><strong><em>Amir Eftekharipour<\/em><\/strong><\/p>\n<\/div>\n<\/div>\n<div class=\"post-date no-social-btn post-updated\">Updated on<time class=\"updated dt-updated\" itemprop=\"dateModified\" datetime=\"2025-07-08T03:59:36+00:00\"> 8 July 2025<\/time><\/div><\/div>","protected":false},"excerpt":{"rendered":"NIDC&#8217;s CEO prioritizes localizing key equipment and increasing domestically manufactured components in drilling projects, resulting in $7 million savings from the construction of its third domestically built rig.","protected":false},"author":1,"featured_media":14716,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[47,22,36,19,16,35],"tags":[],"services":[],"class_list":["post-14715","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-iran","category-lastnews","category-news","category-oil","category-topnews"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/14715","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=14715"}],"version-history":[{"count":0,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/14715\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/14716"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=14715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=14715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=14715"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=14715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}