{"id":14339,"date":"2025-05-28T03:48:26","date_gmt":"2025-05-28T03:48:26","guid":{"rendered":"https:\/\/roydadnaft.ir\/English\/?p=14339"},"modified":"2025-05-28T03:48:26","modified_gmt":"2025-05-28T03:48:26","slug":"flare-gas-recovery-projects-on-track-for-completion","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/14339\/","title":{"rendered":"Flare gas recovery projects on track for completion"},"content":{"rendered":"<div class=\"entry-content\" itemprop=\"description\"><p><span class=\"pre-content-text\"><a style=\"color: #0038a8;\" href=\"https:\/\/roydadnaft.ir\/English\/\">RoydadNaft &#8211; <\/a><\/span>\u00a0The director of oil and gas production supervision at the National Iranian Oil Company (NIOC) reported significant progress in flare gas recovery projects, stating that the company is legally required to collect and inject a major portion of associated petroleum gases into the national grid or downstream industries by the end of the Seventh Development Plan.<\/p>\n<div class=\"item-body\">\n<div class=\"item-text\">\n<p dir=\"ltr\">According to NIOC, Farokh Alikhani highlighted the legal mandate to recover flare gases by the end of the Seventh Development Plan, noting that implementation began during the Sixth Development Plan and is now being pursued through three short-, medium-, and long-term projects.<\/p>\n<p dir=\"ltr\">Alikhani said short-term projects are primarily carried out through auctions and gas sales to the private sector, adding that some flare gas has already been recovered this way in recent years.<\/p>\n<p dir=\"ltr\">He identified the medium-term projects as the large-scale Bid Boland and Maroon flare gas recovery initiatives, both underway in the operational area of the National Iranian South Oil Company. These projects have already collected several million cubic meters of flare gas, with the remaining volumes set to be gradually recovered by 2027.<\/p>\n<p dir=\"ltr\">Regarding long-term projects, Alikhani explained that they involve supplying feedstock to natural gas liquid (NGL) complexes, including NGL 3100, NGL 3200, and Kharg NGL.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">He provided updates on their progress:<\/p>\n<p dir=\"ltr\">&#8211; NGL 3100 will begin initial operations within the next two months.<\/p>\n<p dir=\"ltr\">&#8211; NGL 3200 reached initial operation in 2023.<\/p>\n<p dir=\"ltr\">&#8211; Kharg NGL is nearing completion.<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">Physical progress stands at:<\/p>\n<p dir=\"ltr\">&#8211; Bid Boland (75%)<\/p>\n<p dir=\"ltr\">&#8211; Maroon (74%)<\/p>\n<p dir=\"ltr\">&#8211; Khark NGL (73%)<\/p>\n<p dir=\"ltr\">&#8211; NGL 3100 (~93%)<\/p>\n<p dir=\"ltr\">&#8211; NGL 3200 (~96%)<\/p>\n<p dir=\"ltr\">\n<p dir=\"ltr\">Alikhani emphasized that these projects will be completed in phases by the end of the Seventh Development Plan, with recovered gas either fed into the national grid or used as petrochemical feedstock.<\/p>\n<p dir=\"ltr\">He noted that domestic expertise has been key in executing these projects, from engineering to installation, with 65% of equipment sourced locally. The remaining 35%, mainly high-tech items\u2014particularly for sour gas processing\u2014were imported.<\/p>\n<p dir=\"ltr\">Finally, Alikhani clarified that funding did not come from NIOC\u2019s budget. Instead, under Article 48 of the Sixth Development Plan, domestic investors\u2014including the private sector, individuals, the National Development Fund, and holdings like Persian Gulf Holding\u2014fully financed the projects.<\/p>\n<\/div>\n<\/div>\n<div class=\"post-date no-social-btn post-updated\">Updated on<time class=\"updated dt-updated\" itemprop=\"dateModified\" datetime=\"2025-05-28T03:48:26+00:00\"> 28 May 2025<\/time><\/div><\/div>","protected":false},"excerpt":{"rendered":"The director of oil and gas production supervision at the National Iranian Oil Company (NIOC) reported significant progress in flare gas recovery projects, stating that the company is legally required to collect and inject a major portion of associated petroleum gases into the national grid or downstream industries by the end of the Seventh Development Plan.","protected":false},"author":1,"featured_media":14340,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[47,20,22,36,19,35],"tags":[],"services":[],"class_list":["post-14339","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-gas","category-iran","category-lastnews","category-news","category-topnews"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/14339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=14339"}],"version-history":[{"count":0,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/14339\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/14340"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=14339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=14339"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=14339"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=14339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}