{"id":10502,"date":"2024-04-23T11:05:40","date_gmt":"2024-04-23T11:05:40","guid":{"rendered":"https:\/\/roydadnaft.ir\/English\/?p=10502"},"modified":"2024-04-23T11:05:40","modified_gmt":"2024-04-23T11:05:40","slug":"canadas-tc-energy-says-ngtl-pipeline-system-resumes-normal-operations-after-fire","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/10502\/","title":{"rendered":"Canada&#8217;s TC Energy says NGTL pipeline system resumes normal operations after fire"},"content":{"rendered":"<div class=\"entry-content\" itemprop=\"description\"><p><span class=\"pre-content-text\"><a style=\"color: #0038a8;\" href=\"https:\/\/roydadnaft.ir\/English\/\">RoydadNaft &#8211; <\/a><\/span>\u00a0TC Energy&#8217;s NGTL gas pipeline system in the western Canadian province of Alberta has resumed normal operations after a rupture last week prompted the company to reduce pressure on a segment of the line, TC said in a statement on Monday.<\/p>\n<div data-testid=\"paragraph-1\" data-reader-unique-id=\"23\">The cause of the rupture, which sparked a wildfire in a remote part of Yellowhead County, is still under investigation.<\/div>\n<p data-reader-unique-id=\"25\">&#8220;We have stood down our Yellowhead County incident emergency response and transitioned to the repair and restoration phase,&#8221; a TC Energy spokesperson said, adding that the company was continuing to work with regulators.<\/p>\n<p data-reader-unique-id=\"118\">The NGTL is TC Energy&#8217;s natural gas gathering and transportation system, which transports gas produced in the Western Canadian Sedimentary Basin (WCSB) to markets in Canada and United States.<\/p>\n<div class=\"post-date no-social-btn post-updated\">Updated on<time class=\"updated dt-updated\" itemprop=\"dateModified\" datetime=\"2024-04-23T11:05:40+00:00\"> 23 April 2024<\/time><\/div><\/div>","protected":false},"excerpt":{"rendered":"TC Energy&#8217;s NGTL gas pipeline system in the western Canadian province of Alberta has resumed normal operations after a rupture last week prompted the company to reduce pressure on a segment of the line, TC said in a statement on Monday.","protected":false},"author":1,"featured_media":10503,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[47,46,36,19,16,35],"tags":[],"services":[],"class_list":["post-10502","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-international","category-lastnews","category-news","category-oil","category-topnews"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/10502","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=10502"}],"version-history":[{"count":0,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/10502\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/10503"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=10502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=10502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=10502"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=10502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}