{"id":10230,"date":"2024-03-28T12:18:56","date_gmt":"2024-03-28T12:18:56","guid":{"rendered":"https:\/\/roydadnaft.ir\/English\/?p=10230"},"modified":"2024-03-28T12:18:56","modified_gmt":"2024-03-28T12:18:56","slug":"iran-says-will-speed-up-apg-collection-process-inaugurate-ngl-3100-plant-soon","status":"publish","type":"post","link":"https:\/\/roydadnaft.ir\/English\/10230\/","title":{"rendered":"Iran says will speed up APG collection process, inaugurate NGL 3100 plant soon"},"content":{"rendered":"<div class=\"entry-content\" itemprop=\"description\"><p><span class=\"pre-content-text\"><a style=\"color: #0038a8;\" href=\"https:\/\/roydadnaft.ir\/English\/\">RoydadNaft &#8211; <\/a><\/span>\u00a0Iran\u2019s oil minister said on Wednesday the process of gathering associated petroleum gas (APG) will be accelerated in the Persian New Year (starting March 20).<\/p>\n<div class=\"item-body\">\n<div class=\"item-text\">\n<p dir=\"ltr\">Talking to reporters on the sidelines of the cabinet weekly meeting, Javad Owji added the NGL 3100 plant in Dehloran, the western province of Ilam, will be put into operation in the presence of President Seyyed Ebrahim Raeisi within two months.<\/p>\n<p dir=\"ltr\">The associated gases of the oil fields in western Iran were burnt off in flares in the past years, regretted the oil minister, adding all flare gases in Ilam and Kermanshah provinces \u2013 250 million cubic feet per day (mcf\/d) \u2013 will be captured when the APG collection projects for western Iran are completed.<\/p>\n<p dir=\"ltr\">Nearly 7 million cubic meters (mcm) of gas will be injected into the national grid per day when the NGL 3100 plant becomes operational, said Owji, explaining one million tons of ethane will be carried to petrochemical complexes in southern Iran through a constructed pipeline with the aim of providing the plants with feedstock and turning associated gases into products with added value.<\/p>\n<p dir=\"ltr\">He also said the oil and gas industry witnessed the highest economic growth \u2013 over 20 percent \u2013 in the previous Iranian calendar year, pledging the semifinished projects will be completed this year.<\/p>\n<p dir=\"ltr\"><strong>Joint fields<\/strong><\/p>\n<p dir=\"ltr\">Under the 13th administration, oil and gas extraction from joint fields has increased by around 75,000 barrels and 50 mcm per day respectively, said Owji.<\/p>\n<p dir=\"ltr\">Top priority has been given to oil and gas production in joint fields, underlined the top official, continuing contracts for the development of all shared offshore and onshore fields have been signed.<\/p>\n<p dir=\"ltr\"><strong>IP gas pipeline project<\/strong><\/p>\n<p dir=\"ltr\">\u00a0\u201cAccording to the contract on Iran-Pakistan (IP) gas pipeline project, the two countries have some obligations,\u201d said Owji, pointing out Iran has fulfilled its obligations.<\/p>\n<p dir=\"ltr\">\u201cWe have held constructive talks with the Pakistani party and Islamabad is willing to finish building the pipeline on its side,\u201d said the oil minister, expressing hope the project on Pakistan\u2019s soil will be carried out and Iran\u2019s gas will be exported to the neighboring country.<\/p>\n<p dir=\"ltr\">Last week, Pakistan\u2019s Foreign Ministry spokesperson reacted to recent remarks by U.S. Assistant Secretary for South and Central Asian Affairs Donald Lu on her country\u2019s joint gas pipeline project with Iran.<\/p>\n<p dir=\"ltr\">Islamabad has remained committed to implementing the gas project in accordance with the spirit of the bilateral agreement with Tehran, Mumtaz Zahra Baloch said.<\/p>\n<p dir=\"ltr\">Pakistan does not need to consult others or be exempted from sanctions but wants to go ahead with the project of transferring gas from the Islamic Republic of Iran, she said, referring to Lu\u2019s warning that \u201cWashington has not received any request from Islamabad regarding sanctions relief and therefore the efforts to stop Pakistan from Iran&#8217;s gas project will continue\u201d.<\/p>\n<\/div>\n<\/div>\n<div class=\"post-date no-social-btn post-updated\">Updated on<time class=\"updated dt-updated\" itemprop=\"dateModified\" datetime=\"2024-03-28T12:18:56+00:00\"> 28 March 2024<\/time><\/div><\/div>","protected":false},"excerpt":{"rendered":"Iran\u2019s oil minister said on Wednesday the process of gathering associated petroleum gas (APG) will be accelerated in the Persian New Year (starting March 20).","protected":false},"author":1,"featured_media":10231,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[47,20,18,22,36,19],"tags":[],"services":[],"class_list":["post-10230","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-gas","category-headline","category-iran","category-lastnews","category-news"],"_links":{"self":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/10230","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/comments?post=10230"}],"version-history":[{"count":0,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/posts\/10230\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media\/10231"}],"wp:attachment":[{"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/media?parent=10230"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/categories?post=10230"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/tags?post=10230"},{"taxonomy":"services","embeddable":true,"href":"https:\/\/roydadnaft.ir\/English\/wp-json\/wp\/v2\/services?post=10230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}